Above-Ceiling Tools

Above-Ceiling Tools previews

Use these tools to ensure above-ceiling work in your facility is safe, effective and compliant.

To properly maintain the health care physical environment, facilities professionals must be able to access the utilities and wiring routed above the finished ceiling. However, this may disturb dust and debris located above the ceiling. While this may not impact most individuals, it can be a danger to certain patients. These tools can be used by facility managers to help develop and carry out a robust above-ceiling access program.

The Above-Ceiling Checklist can be used when performing inspections to check for deficiencies and hazards in the above-ceiling environment. The tool lists the most salient elements to look out for when conducting an inspection, as well as areas to catalog photo documentation and work order numbers.

Use the Above-Ceiling Work Permit Policy Sample as a template to develop language for a policy at your own facility.

Access to these tools is a benefit of ASHE membership. Click here to join ASHE!

 Download Permit Policy Tool Members download this tool
 Download Checklist Members download this tool
Join ASHE Nonmembers can join ASHE to download this tool
Read article Check out the related HFM magazine article, "Protecting patient spaces when working overhead."

Related Resources

Advocacy
Achieve compliance with Joint Commission Documentation Standards. Learn how to effectively document standards with our comprehensive guide.
This downloadable Word document is a policy on maintaining utility system drawings and documents to aid in the shutdown process during emergencies.
Compliance Tools
This downloadable Word document is a sample monthly log for maintaining special ventilation rooms.
This PowerPoint presentation details LS.02.01.20 and locking requirements included in the Life Safety Code.
Guides/Reports
First significant benchmarking effort in health care facility management operations based on information collected by IFMA and ASHE
NFPA HITF interpretations, June 2010 on floor/ceiling assembly for occupancy separation, exit access from suites, fire doors, sprinkler clearance a