Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Monograph
Improve your hospital's electrical infrastructure, power system reliability, and staff training with the utility management program approach.
Monograph
Monograph: The Environment of Care and Health Care-Associated Infections: An Engineering Perspective
This monograph explores the role of the health care environment in infection control, provides information on common pathogens, and gives details on…
Monograph
Operating room setback is a proven energy-saving strategy for hospitals and ambulatory surgery centers. This paper presents possibilities and…
Compliance Tools
Tool for Assessing Compliance with Joint Commission Life Safety Specialist Areas of Emphasis