Backlog Analysis Tool

Backlog Analysis Tool thumbnail

As equipment operates throughout its useful lifecycle, signs of failure will begin to manifest. Neglecting these warning signs can lead to functional failure and ultimately catastrophic failure. Without access to the appropriate resources or a robust asset management program, many health care facilities professionals struggle to escape the vicious cycle known as “reactive maintenance,” wherein a team’s bandwidth to address intentional maintenance activities is lost to backlog of deferred maintenance.

Use this tool to assess the current condition of a system or facility’s asset management program and benchmark the effectiveness of the current investment strategy.


 Download Tool Members download this tool. Click here to join ASHE!
Check out the related HFM magazine article, (coming soon)

 

ASHE authorizes the copy, use and customization of this template, by health care facilities for non-commercial use only. In consideration of this authorization, the user agrees that any copy of this document which the user makes shall retain all copyright and other proprietary notices that may be contained therein. ASHE accepts no responsibility or liability for the accuracy or the completeness of the information in this document.

Related Resources

Videos
We are proud to introduce a valuable resource that will empower you and your team to reinforce the critical role of ventilation in health care…
Guides/Reports
Learn how your health care facility’s energy reduction efforts compare to national benchmarks with this report.
On-Demand Educational Webinars
Discover how Circadian Rhythm lighting is reshaping healthcare, promising a brighter, healthier future for all.
Compliance Tools
This tool leverages existing core infection control risk assessment (ICRA) principles to establish a framework for water safety management during…
Compliance Tools
Use the energy control procedure form to provide detailed information on lock usage and other important information on the specific equipment or…
Book
Achieve the facility you want. With information specific to health care facilities, these guidelines assign accountability for actual building…