Front Line Staff Participating in the Design Process
Author: Jordan Plyler, CM-Lean, facilities manager at Baptist Health Medical Center of Arkansas
This tool can be used to assist design professionals in designing clinical areas which meet the needs of the end users. Often clinical areas are designed with little input from frontline staff. This lack of full staff participation leads to items being left out of the design or being provided in the wrong location.
Access to these tools is a benefit of ASHE membership. Click here to join ASHE!
Download Tool | Members download this tool |
Sign up for updates | Nonmembers can join ASHE to download this tool or keep in touch |
Check out the related HFM magazine article, (coming soon) |
Related Resources
Case Studies
Hospital system in the District of Columbia saves $42,000 a year by bringing sustainability efforts into sharp focus.
Case Studies
New heating and water system in brand new facility tweaks design for improved sustainability.
Case Studies
Embracing energy efficiency to attain measurable results is a facility-wide effort.
Case Studies
Excela’s executives charged its hospital directors with finding cost-cutting opportunities.
Case Studies
Even small hospitals can make big moves to improve their sustainability.
Case Studies
ASHE hosted a two-day Energy to Care Treasure Hunt at the University of Maryland Medical Center (UMMC) in Baltimore