Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Lunch and Learn
New water management standards are in effect from The Joint Commission.
Lunch and Learn
As COVID-19 variants trigger new waves of uncertainty, many depleted healthcare facilities management (FM) teams are unprepared for the next spike in…
Compliance Tools
Learn how implementing a PdM program can reduce maintenance costs by 8-12% compared to preventive maintenance.
Education & Events
Gain confidence in the five key competency areas of the CHFM exam. Plus get insight into exam content and preparation techniques.
Lunch and Learn
Join Mark Kenneday, Bobby Baird, and Bert Gumringer in an open panel lunch and learn covering best practices for operational sustainability.