Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Lunch and Learn
The model codes used in the U.S. include several requirements that are specific to health care facilities, and with new editions of the codes…
Monograph
The ASHE ICRA 2.0™ Process Guide is your how-to manual for successfully engaging the ASHE ICRA 2.0 tool. It closely follows the steps outlined on…
Lunch and Learn
Leveraging a new generation of FCA software to create a prioritized capital plan and an always-current listing of every asset’s current state.
On-Demand Educational Webinars
Join a panel of code experts to discuss the latest developments on emergency preparedness, CMS and more in regards to codes and standards…
Lunch and Learn
The Challenges with Decarbonization | Presented by Gordian
Education & Events
Expand your knowledge of electrical systems and electrical equipment during this overview of NFPA 99, Health Care Facilities Code.