Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

On-Demand Educational Webinars
Understand how the structural design loads for parking structures differ from those of occupied spaces, and more.
On-Demand Educational Webinars
With the constantly evolving criteria required to address the surge of patients impacted by the COVID-19 virus, there are many options that health…
Lunch and Learn
Grainger is committed to helping you keep your operations up and running during the coronavirus (COVID-19) pandemic. During this webinar Grainger and…
Checklists/Tools
Increase patient capacity across the country by making additional spaces for our patients via converting alternate care sites to patient space…
Compliance Tools
Negative Pressure Room Guidelines: Learn about the importance of temporary negative pressure patient rooms and how to achieve it in your facility.