Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Videos
Speakers: Ed Tinsley, Mark Smith, Gerry Kaiser and Mike Fullerton2013 PDC Summit
Monograph
This monograph provides guidance on how to determine replacement needs for electrical distribution equipment, including strategies for upgrading an…
Videos
This session provides a detailed look at the many codes and standards that health care engineers must know to have a successful, code-compliant…
On-Demand Educational Webinars
CMS Adoption of the 2012 Edition of NFPA 99 and What It Means for Health Care FacilitiesThursday, September 15
Videos
Speakers: David Stymiest and Jason D'Antona
Videos
Speaker: William Deitenbeck