Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Monograph
This monograph describes an EPS management program that will equip health care facilities to meet the requirements and challenges they face today.
On-Demand Educational Webinars
Speakers: Bob Bedard, Gordon Burrill, Eileen Clarkson
Guides/Reports
This 2013 ASHE Advocacy Report features articles on the unique hospital environment, improving codes and standards, and ways to get involved.
Monograph
The study compares anticipated plug load with energy intensity data provide guidance for designers in estimating a facility's design load.
On-Demand Educational Webinars
Recorded December 4, 2013Speaker: Mike Daniel, President of Daniel Consulting, Lt
Videos
Speaker: Mark Linenberger, Spencer Seals and Stewart Trapino