Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

On-Demand Educational Webinars
Recorded October 27, 2016Speakers: Joe Fiorito, Caterpillar Inc., Electric Power Division, Rental Manager; Ben Thomas, Ca
On-Demand Educational Webinars
Recorded August 10, 2016The Centers for Medicare & Medicaid Services has adopted the 2012 edition of NFPA 101.
On-Demand Educational Webinars
Speakers: George Mills, MBA, FASHE, CEM, CHFM, CHSP, Director of Engineering, Department of Engineering, The Joint Commission
On-Demand Educational Webinars
Recorded June, 2016Speaker: Tim AdamsThis video outlines changes made in 2016 to the CMS Condit
On-Demand Educational Webinars
Recorded May 24, 2016
Guides/Reports
The 2015 ASHE Advocacy Report includes articles on improving codes, code compliance, and outreach.