Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Compliance Tools
Allocating project resources made easy with ASHE's resource scheduling tool. Join ASHE for access to this valuable tool. Sign up today!
Standards/Guidelines
ANSI/ASHRAE/ASHE Standard 170 offers guidance, regulation and mandates to designers and operators of health care facilities. The revised 2021 edition…
Lunch and Learn
Lunch and Learn
This seminar explores the drivers behind these changes and prepares the attendee to navigate the quickly evolving landscape through practical…
Standards/Guidelines
The purpose of this standard is to prescribe the procedures, methods, and documentation requirements for the design, construction, and operation of…