Success Stories - University of Maryland Medical Center
Overview of Case Study
UMMC is the academic medical center of the 13-hospital University of Maryland Medical System. The initial UMMC structure was built in 1937, and six additions from 1957 to 2013 have brought the facility’s floorspace to 2.5 million square feet.
Richie Stever, CHFM, CLSS-HC, UMMC’s director of operations and maintenance, did not have specific outcomes in mind for the treasure hunt. He saw the treasure hunt as a way to help UMMC reach its goal of reducing energy consumption by 20 percent by 2022 as part of the Better Buildings Challenge through the U.S. Department of Energy (DOE).
Related Resources
Videos
Speakers: Ed Tinsley, Mark Smith, Gerry Kaiser and Mike Fullerton2013 PDC Summit
Monograph
This monograph provides guidance on how to determine replacement needs for electrical distribution equipment, including strategies for upgrading an…
Videos
This session provides a detailed look at the many codes and standards that health care engineers must know to have a successful, code-compliant…
On-Demand Educational Webinars
CMS Adoption of the 2012 Edition of NFPA 99 and What It Means for Health Care FacilitiesThursday, September 15