Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

On-Demand Educational Webinars
Speaker: ASHE
Compliance Tools
Regulations and Interpretive Guidelines for Hospitals) contains all CMS requirements and survey guidance for a hospital alternate equipment…
Lunch and Learn
Learn from fellow health care operations professionals the keys to acing your next compliance survey. Gain insights on utilizing technology to help…
Lunch and Learn
In this webinar, Dr. Thomas Doerdelmann will introduce a new in-air pathogen surveillance solution that can identify the presence of SARS-CoV-2, FLU…
Lunch and Learn
This course discusses how once basic interior sliding doors systems have evolved into a sophisticated solution for a range of commercial spaces with…
Compliance Tools
While Ultraviolet (UV) radiation is not a new tool for disinfection, the COVID-19 pandemic has brought it to the forefront of discussions again. UV…