Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Lunch and Learn
This lunch and learn will talk about impact and usage of sensors, as well as, highlight novel implementations.
Education & Events
Strengthen your facility's readiness for compliance surveys with ASHE's Physical Environment Survey Readiness Program. Register now for upcoming live…
Book
Introduction to Health Care Facilities Management: This award-winning, in-depth 130+ page introductory book provides an orientation to the dynamic…
Lunch and Learn
Walk through the electrical safety roadmap from pre-design through installation and post-installation.
Lunch and Learn
This course will walk participants through site acceptance and in-service testing and will review best practices that will empower facility owners…
Lunch and Learn
In this webinar, the presenters will review current and proposed CMS/TJC requirements in the context of ASHRAE 188 and will discuss practical…