Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Resources
Find additional resources that will help you reduce energy use and get the most out of the Energy to Care program.
Resources
Get real-world sustainability tips from professionals in health care facilities. Learn how to thrive in energy sustainability best practices.
Resources
This 2 day event brings together health care facilities professionals on a quest to discover low-cost energy savings opportunities at a hospital or…
Resources
Since 2010, over 3,500 facilities have recognized significant energy savings through the Energy to Care program.
Compliance Tools
This downloadable Word document is a sample monthly log for maintaining special ventilation rooms.
Guides/Reports
First significant benchmarking effort in health care facility management operations based on information collected by IFMA and ASHE