Success Stories - Midland Memorial Hospital

Overview of Case Study

Sometimes even newer hospitals can be tweaked to improve sustainability. That was the case with Midland Memorial Hospital in Midland, Texas, which opened a new patient tower in December 2012.

“When we became involved with Midland Memorial in 2014, we did a study that assessed the systems and the lay of the land and realized there were a lot of moving parts because of the recent expansion,” explains James Hess, Energy Engineer at Bernhard TME, the engineering firm that helped the hospital reduce energy consumption. “The hospital had 445,000 square feet prior to 2012, but with the new patient tower that rose to 789,000 square feet. The building had been commissioned when it was opened, but we still found significant savings potential.”

Bernhard TME developed a wide range of energy-saving plans for the hospital, ranging from tweaking the Johnson Controls Metasys building automation system (BAS) to a complete upgrade of the heating water system and chilled water system.

Read More

Related Resources

Guides/Reports
First significant benchmarking effort in health care facility management operations based on information collected by IFMA and ASHE
Guides/Reports
Expanded analysis of Health Facilities Management 2012 compensation survey by primary area of responsibility, organizational setting, number of beds…
Guides/Reports
This collection of articles will help health care facilities professionals understand and prepare for new trends that experts anticipate emerging i
Compliance Tools
Taming building automation system alarm fatigue
Education & Events
Increase your understanding of electrical systems, the lifeblood of the health care facility.
Compliance Tools
Determine which requirements can be completed in-house and the possible cost benefits of each.